I bought a corner lot ground floor suppose to get my keys on the 17 Apr 09 it has been delayed, i had the access to my unit with a resident, just cant believe it what i saw. 1.The height of the toilet 2.All the balcony water pipes been channel to my floor. 3.A monsoon drain next to my home wide open.
i`m looking forward to attend any of those meetings,the developer hand over x amount keys and they put a stop to it due complaints.these alot of hidden issue.
3 comments:
i just got my keys today. a lot thing to be discuss.
I bought a corner lot ground floor suppose to get my keys on the 17 Apr 09 it has been delayed, i had the access to my unit with a resident, just cant believe it what i saw.
1.The height of the toilet
2.All the balcony water pipes been channel to my floor.
3.A monsoon drain next to my home wide open.
i`m looking forward to attend any of those meetings,the developer hand over x amount keys and they put a stop to it due complaints.these alot of hidden issue.
Post a Comment